New Mexico, U.S.A.
Project Solis will be a 3.6 GW solar cell and module manufacturing facility utilizing advanced heterojunction (HJT) technology to deliver high-efficiency, next-generation solar products. Located in New Mexico, the project leverages over $275 million in state and federal incentives under the IRA to strengthen domestic supply chains and reduce reliance on foreign manufacturing. The facility will position Convalt Energy as one of the largest fully integrated American solar manufacturers within 36 months.
Nameplate Capacity: 3.6 GW
Location: New Mexico, U.S.A.
Surface Area: Approximately 2,500,000 square feet
Value: $675 million
Watertown, New York, U.S.A.
This will be a state-of-the-art solar cell manufacturing facility featuring advanced heterojunction technology with a rated capacity of 2 GW of solar cell production annually. This facility is designed to support the growing demand for domestically manufactured high-efficiency solar cells, reducing dependence on foreign supply chains.
Nameplate Capacity: 2 GW of Modules
Location: New York, U.S.A.
Surface Area: 2,200,000 square feet
Value: $400 million of preferred equity
East Millinocket, Maine, U.S.A
Convalt is developing a 12 MW community solar project in East Millinocket, beginning with an initial 2 MW phase. The project will supply clean, affordable electricity to local residents and businesses, while creating new employment opportunities and supporting the town’s transition toward a sustainable energy future.
Nameplate Capacity: 12 MW
Power Off-taker: Community Solar & Direct to Consumers
Location: East Millinocket, Maine
Surface Area: 21.5+ Acres
Total Investment: $6 million
Maine, U.S.A
Convalt is developing a 3 GW solar project designed to supply clean, reliable electricity to Maine communities and the regional ISO-New England grid. This large-scale initiative will strengthen energy security, meet rising power demand across the Northeastern United States, and advance the region’s transition to sustainable energy.
Nameplate Capacity: 3 GW
Power Off-taker: New England ISO
Location: Maine
Surface Area: 12,000 Acres
Total Investment: $3 billion
New Mexico, U.S.A
Our first recycling facility will be located in New Mexico, co-located with Convalt’s solar cell and module manufacturing operations. The project is progressing through the permitting and approval process with local, state, and federal agencies and will move to full development upon completion of these approvals.
Nameplate Capacity: 1 GW
Location: New Mexico
Surface Area: 10+ Acres
Total Investment: $5 million
Maine, U.S.A
Convalt Data Center is developing a major site in northern Maine spanning approximately 10,000 acres. The project will offer a fully turnkey data center campus with dedicated water access and behind-the-meter power available before 2030. The site is secured under a master lease and has received preliminary municipal approvals.
Nameplate Power Capacity: Phase 1 - 500 MW; Phase 2 - up to 2 GW
Power Off-taker: Data center customers
Location: Northern Maine
Surface Area: 10,000 Acres
Total Investment: $1 billion+
New Mexico, U.S.A
Convalt Data Center is advancing development of a 5,000+ acre site in New Mexico, designed to provide a complete turnkey solution with water access and behind-the-meter power prior to 2030. The property is being acquired by a wholly owned Convalt subsidiary and will employ a multi-use strategy, integrating power supply for both the data center and adjacent manufacturing facilities.
Nameplate Power Capacity: Phase 1 - 500 MW; Phase 2 - up to 2GW
Power Off-taker: Data center customers
Location: New Mexico
Surface Area: 5,000+ Acres
Total Investment: $1 billion+
Andhra Pradesh, India
Redan Infrastructure Private Limited (RIPL), established in 2009, is a private limited company incorporated under the Companies Act (No. 1 of 1956). Headquartered in Hyderabad, India, RIPL developed and constructed this 7.5 MW AC waste-to-power plant that runs on industrial waste feedstock. The plant was commissioned and made operational with a Commercial Operation Date (“COD”) of March 31, 2015.
Nameplate Capacity: 7.5 MW
Power Off-taker: Andhra Pradesh Southern Power Distribution Corporation Limited
Location: Palamaner, Chittoor District, Andhra Pradesh, India
Surface Area: 14 Acres
Total Investment: $8.3 million
Andhra Pradesh, India
Convalt is negotiating with lenders for financing RIPL-GP´s 7.5 MW Waste-to-Power Project at Kothavalasa Village, Vizianagaram district of Andhra Pradesh, India.
Nameplate Capacity: 7.5 MW
Power Off-taker: Andhra Pradesh Southern Power Distribution Corporation Limited
Location: Kothavalasa Village, Vizianagaram district, Andhra Pradesh, India
Surface Area: 14 Acres
Total Investment: $8.3 million
Mandalay Region, Republic of the Union of Myanmar
Convalt has developed a fully permitted 300 MW AC solar power project in the Mandalay Division of Myanmar, Southeast Asia. The project comprises two sites, Nabuaing and Wundwin, each with a capacity of 150 MW. At both locations, the 150 MW is divided into three 50 MW solar PV array blocks utilizing First Solar Series 4 advanced thin-film modules. The generated DC power is converted through General Electric’s ProSolar central inverters, ensuring efficient and reliable energy delivery.
Nameplate Capacity: 300 MW
Power Off-taker: Electric Power Generation Enterprise (“EPGE”)
Location: Central Mandalay Region, Myanmar
Surface Area: 1,000 + 850 Acres
Total Investment: $250 million
Attapue Province, Lao P.D.R.
In 2016, Convalt initiated the development of a large-scale solar power project in the Province of Attapeu, Southern Lao P.D.R. As of December 2022, the project has received approvals for up to 1,200 MW of solar capacity and is now in the final stages of development.
Convalt Energy, in partnership with DigiCollect LLC, an affiliate of Convalt Energy Inc., has completed the initial site survey for the Laos Solar Project. The survey confirmed favorable site conditions and formed the basis for the full feasibility study. The finalized report will be shared with prospective EPC contractors in advance to expedite the tendering and construction phases of the project.
Nameplate Capacity: 1,200 MW
Power Off-taker: Vietnam Electricity (“EVN”)
Location: Attapue Province, Laos Peoples Democratic Republic
Surface Area: 4,400 Acres
Total Investment: $1.3 billion
N’Djamena, Republic of Chad
Convalt is developing a 120 MW solar project to service the capital region of Chad – namely N’Djamena which requires much needed electricity at attractive electricity process. Convalt is also planning on adding battery storage for 20% of the installed solar capacity.
Nameplate Capacity: 120 MW
Power Off-taker: Direct to Consumer
Location: N’Djamena, Republic of Chad
Surface Area: 300 Acres
Total Investment: $250 million
Multiple Locations, Republic of Chad
Convalt Energy will invest up to US $30 million for the development of a 30 MW AC Solar Power Solution for multiple locations in the Republic of Chad.
Nameplate Capacity: 30 MW
Power Off-taker: Direct to Consumer
Location: Multiple Locations, Republic of Chad
Surface Area: 150 Acres
Total Investment: $30 million
Seven Cities Across Sierra Leone
Convalt is developing a series of rural electrification projects across Sierra Leone for an aggregate of 60 MW of solar. This would provide the much-needed electricity for the communities in these cities. Convalt will be adding either diesel or batteries to provide baseload power.
Nameplate Capacity: 60 MW
Power Off-taker: Direct to Consumer
Location: Multiple Locations, Sierra Leon
Surface Area: 300 Acres in aggregate
Total Investment: $100 million