Convalt Energy
S31 · Source summary

A feasibility agreement for Kobong

Reporting on the agreement to study renewable energy and digital infrastructure in Lesotho.

Newsday reported that Lesotho’s Minister of Energy, Lejone Mpotjoane, and Convalt founder and CEO Hari Achuthan signed a memorandum of agreement to undertake a feasibility study at Kobong in Leribe.

From discussions to a formal study

The report traced discussions to a meeting in Morocco in August 2025, followed by a company proposal and a letter of intent. It described a 12-month study period, with the possibility of renewal.

Energy and digital connectivity

The proposed scope included 1,200 MW of renewable energy, hydropower integration and a 900 MW data center. The article discussed potential investment of $6 billion in energy and $20 billion in the data center, alongside transmission and fiber connectivity through South Africa. These were proposed investments and capacities associated with the study.

Domestic energy needs

The article described ground-mounted and floating solar on the Senqu River, together with pumped-water hydropower. The energy minister emphasized meeting Lesotho’s own electricity demand before exporting power.

Related projects & milestones