Newsday reported that Lesotho’s Minister of Energy, Lejone Mpotjoane, and Convalt founder and CEO Hari Achuthan signed a memorandum of agreement to undertake a feasibility study at Kobong in Leribe.
From discussions to a formal study
The report traced discussions to a meeting in Morocco in August 2025, followed by a company proposal and a letter of intent. It described a 12-month study period, with the possibility of renewal.
Energy and digital connectivity
The proposed scope included 1,200 MW of renewable energy, hydropower integration and a 900 MW data center. The article discussed potential investment of $6 billion in energy and $20 billion in the data center, alongside transmission and fiber connectivity through South Africa. These were proposed investments and capacities associated with the study.
Domestic energy needs
The article described ground-mounted and floating solar on the Senqu River, together with pumped-water hydropower. The energy minister emphasized meeting Lesotho’s own electricity demand before exporting power.