Redan Infrastructure established
Redan Infrastructure Private Limited was established in 2009. The Hyderabad-based company subsequently developed and constructed the Palamaner waste-to-power plant.
Andhra Pradesh, India
Redan Infrastructure Private Limited, established in 2009 and headquartered in Hyderabad, developed and constructed the Palamaner industrial-waste-to-power facility. Convalt records 31 March 2015 as its commercial-operation date and lists the 7.5 MW plant as operating.
Company project information reviewed 13 October 2026. Planned figures describe development scope. View project source
Redan’s history spans project development, commissioning and operations. The 7.5 MW Palamaner waste-to-power facility began commercial operation in March 2015.
Redan Infrastructure Private Limited was established in 2009. The Hyderabad-based company subsequently developed and constructed the Palamaner waste-to-power plant.
Convalt’s project history records commercial operation of Redan’s 7.5 MW waste-to-power plant in Andhra Pradesh, India. The plant was developed and constructed by Redan Infrastructure Private Limited.
View company milestoneConvalt’s public submission to NYSERDA records Anand N.D. joining Convalt and Redan in 2019. It describes his responsibility for Redan operations and prior power-sector commercial experience.
Convalt lists Redan as operating and identifies Andhra Pradesh Southern Power Distribution Corporation Limited as its power off-taker.
The Palamaner facility generates electricity from industrial waste feedstock, combining waste utilization with power supply in Andhra Pradesh.